Testicle shield

Description

Description

The lead testicle shields are designed to eliminate radiation leakage. The top and bottom of the testicle shield can be secured using the supplied rubber straps or with nylon tape. Using the adjustable testicle stand will eliminate the use of rubber straps or nylon tape.
Rotating the opening of the testicle shield towards the ceiling will reduce the scatter of radiation from entering the shield.

Additional information

Additional information

Small – XRT-KRP-MTT-928-200

Small Lead Testicle Shield
Inner Diameter: 2 in (5.09 cm)
Outer Diameter: 3 in (7.65 cm)
Opening: 0.6 x 1.25 in (1.53 x 3.19 cm)
1/2in (1.27 cm) lead wall

Medium – XRT-KRP-MTT-928-250

Medium Lead Testicle Shield
Inner Diameter: 2.5 in (6.37cm)
Outer Diameter: 3.5 in (8.92 cm)
Opening: 0.75 x 1.6 in (1.91 x 4.08 cm)
1/2in (1.27 cm) lead wall

Set up recommendations

Set up recommendations

Set up reccomendation with the Testicle stand

  1. Place half of the shield in the stand cradle.
  2. Adjust height and place testicles on the shield.
  3. Fit the other half of the shield with the first half over the testicles and adjust height of stand if needed.
  4. Rotate the opening of the shield toward the ceiling to reduce scatter from entering the shield.